Our Locations had to be changed. This is because the site
manager at our school was delaying his decision on whether or not he would give
permission to film on school premises with boys for the third time filming. We
required filming this many times because we didn’t have the sufficient camera
shots. In addition, some of our camera shots weren’t to the best of standards
which meant that we had to re-film them. As our school closes at 6pm and needs
students to start leaving at 5:45 we only had a limited time to film. This is
because we had to wait for the majority of the school students to be off the
premises, which were at around 4:00 – 4:15pm, before we started filming.
However, after about a week of waiting, we were told that we
couldn’t film at school with boys on site for the third time. This hugely
impacted our planned filming and also resulted in three scheduled days of
filming to be cancelled. We therefore had to decide whether we changed our
storyboard completely and changed the location or if we would find somewhere
similar to film. After some persuading, Beatriz’s volunteering place, Trinity
at Bowes church, allowed us to use their halls to film our coursework. However,
they asked us to agree to repay them by filming a music concert that was
happening on Friday 30th March.
As our filming was pushed back so far, we had to work extra
hard to complete the editing of our two minute movie opening. This also meant
that we had to attend school during our Easter holiday on Thursday 5th
April to finish our blogs and final two minute movie opening. Beatriz Arredondo
recorded the final version of the voices we used in our final piece. She also
edited the credits. Roshani Perera created the CCTV monitor effect. Mary-Grace
Vicente was unable to attend as she had to go to work.
No comments:
Post a Comment